Conflux Network will be upgraded when the Epoch Number reaches 155140000 (estimated on August 25th at 9:30 (UTC+8)). All nodes need to be upgraded within 3 days. Download “Conflux v3.1.0” here: https://github.com/Conflux-Chain/conflux-rust/releases/tag/v3.1.0
The actual upgrade time can be estimated using the block countdown tool on ConfluxScan: https://confluxscan.org/block-countdown?type=epoch&value=155140000
For more details, please refer to: Conflux v3.1.0 Network Hardfork Upgrade Announcement(Aug 3, 2026)